Cost to Replace

How we calculate replacement costs

Each range is built from three public inputs: what the parts cost at retail, how long the job takes according to published install times, and what the trade earns in your state according to the Bureau of Labor Statistics. Nothing is a single number, and nothing comes from contractor leads.

The formula

Hired price = quantity × (retail parts × contractor markup + labor hours × billing rate) + fixed charges.

Do-it-yourself price = quantity × retail parts + the fixed charges a homeowner pays too (usually the permit). Types that need a license, such as refrigerant work, service panels and torsion springs, show no DIY price.

Every input is a low–high pair. The low end of the result uses every low input and the high end every high input, so the range is deliberately wide. Low ends are rounded down and high ends up: to $10 under $1,000, $50 under $10,000 and $100 above.

Parts: retail prices

Part prices are retail prices for the equipment and materials, from retailer listings (Home Depot, Lowe's, Abt, specialist suppliers), manufacturer price guides and online HVAC equipment sellers, checked on 2026-11-29. Each job page lists the exact pages and what they showed. Some big-box pages block automated reading; where a price came from a search-result listing rather than the product page, the source line says so.

Contractors buy at trade prices and mark them up. We apply a markup of 0–25% on top of retail. HVAC equipment is the exception worth knowing about: the brands with public online prices are mostly value brands, while dealer-only brands such as Carrier, Trane and Lennox are priced only through quotes, so expect those quotes nearer the top of our range or above it.

Labor: hours × a billing rate from BLS wages

Labor hours are person-hours for a typical job, taken from published install times: manufacturer installation guides, Homewyse labor-hour figures and trade sources that state how long a job takes. Where a source gives time on site for a crew, we multiply by the crew size it states.

The billing rate starts from the BLS Occupational Employment and Wage Statistics mean hourly wage for the trade (May 2025). A contractor has to charge much more than the wage:

  • Benefits and payroll costs: wages are about 68% of employer compensation for construction and for installation and repair workers, so compensation is about 1.47 × the wage (BLS Employer Costs for Employee Compensation, table 2, June 2026).
  • Unbillable time: travel, quoting and supply runs. We assume 60–75% of paid hours are billed.
  • Overhead and profit: vehicles, insurance, licensing, office and margin. We assume 15–35%.

That gives a billing multiplier of 1.47 ÷ 0.75 × 1.15 = 2.25 at the low end and 1.47 ÷ 0.60 × 1.35 = 3.3 at the high end. The two assumptions are ours; they are the least certain part of the model.

TradeBLS occupation (SOC)US mean wageBilling rate
PlumberPlumbers, Pipefitters, and Steamfitters (47-2152)$34.70/h$78–$115/h
HVAC technicianHeating, Air Conditioning, and Refrigeration Mechanics and Installers (49-9021)$31.14/h$70–$103/h
ElectricianElectricians (47-2111)$34.37/h$77–$113/h
RooferRoofers (47-2181)$27.95/h$63–$92/h
Carpenter or installerCarpenters (47-2031)$31.55/h$71–$104/h
Flooring installerCarpet Installers (47-2041)$27.40/h$62–$90/h
Concrete or paving crewCement Masons and Concrete Finishers (47-2051)$28.87/h$65–$95/h
Insulation installerInsulation Workers, Floor, Ceiling, and Wall (47-2131)$26.32/h$59–$87/h
Excavation crewOperating Engineers and Other Construction Equipment Operators (47-2073)$31.87/h$72–$105/h

Your state

Labor is scaled by the state's mean wage for that trade divided by the national mean, kept between 0.8 and 1.3 so one survey figure can't swing an estimate too far. Where BLS publishes no state figure for a trade, the US average is used and the state table says so. Part prices are national; shipping, local supply and sales tax are not modelled.

Wages were fetched on 2026-11-29 from the free public BLS API (May 2025 estimates, all industries).

Fixed charges

Permits, haul-away, refrigerant, utility disconnects, excavation and similar items are added as their own line, with the source on the job page. Permit fees vary widely by town; check yours.

How we check the result

Each job page compares our range with figures published by other cost guides (Fixr, This Old House, Bob Vila, Modernize, manufacturers and others). Those figures are shown as published and are not fed into the model. Where ours sits low or high, the page usually explains why, for example dealer-brand HVAC equipment or trenchless sewer equipment costs that our parts-plus-labor model doesn't capture.

Limits

  • These are estimates, not quotes. A contractor who sees the job can find rot, code problems or access issues that change the price.
  • Minimum trip or service-call charges are only included where a page lists them, so small jobs can be quoted above our low end.
  • Prices change. We re-check part prices and BLS wages at least twice a year; the date is in the footer of each page.
  • We have no relationship with any contractor, retailer or manufacturer, and the site carries no ads or affiliate links.