Cost to Replace

Driveway replacement cost

Hiring a concrete or paving crew: about $3,700–$10,600 at US average labor rates for the most common type (Asphalt, tear-out and repave, 600 square feet). Pick the type, size and your state below.

Who does it

Hire a pro

Asphalt, tear-out and repave, 600 square feet, US average

$3,700–$10,600

Equipment and materials$1,800–$4,900
Labor$1,900–$5,750
30.0–60.0 h at $60–$100 an hour
Parts only, if you do it yourselfNot a DIY job

An estimate, not a quote. Sales tax, permits beyond those listed and surprises found once the old driveway is out are not included. How we calculate.

The job
Square foot of residential driveway, old surface torn out and hauled away, base regraded and compacted, new surface placed
Who does it
A concrete or paving crew. BLS mean wage $28.87 an hour; contractors bill $60–$100.
Do it yourself
4 of 5
Permit
Often required, especially for work at the curb cut or apron; check with the city or county.
Lifespan
Up to 20 years for asphalt; 20–35 years for concrete; gravel much longer with new stone every few years.

Driveway replacement cost by type

US average labor rates, 600 square feet. Hired price includes equipment and labor. Numbers in brackets link to the sources.

TypeHiredParts retail per square footLabor per square footDIY parts
Asphalt, tear-out and repave
2–3 in. of hot-mix asphalt over a compacted gravel base.
$3,700–$10,600$3.0–$6.5 [1][2]0.05–0.1 h [1]Pro only
Concrete, tear-out and repour
4 in. plain concrete, broom finish.
$4,200–$10,700$2.5–$5.0 [3]0.07–0.12 h [3][1]$1,500–$3,000
Gravel, regrade and new stone
4–6 in. of crushed stone over the existing base; no tear-out.
$1,050–$3,150$0.5–$1.5 [4][5]0.02–0.035 h [5]$300–$900

Parts vs labor

Most common type (Asphalt, tear-out and repave): equipment and materials $1,800–$4,900, labor $1,900–$5,750 (30.0–60.0 hours).

Labor and equipment are about half of a paved driveway. Inch Calculator and LawnStarter both put labor at roughly 40–50% of a concrete driveway's price, and Bob Vila puts asphalt installation labor at $5–$7 per sq ft.

Gravel is the opposite: the stone is cheap, and most of the cost is grading, hauling and spreading. Fixr puts labor for an average two-car gravel driveway at $1,150–$1,250.

What drives the price

  • Material. Plain gray concrete costs $5–$8 per sq ft installed per ConcreteNetwork, asphalt replacement runs $8–$15 per sq ft per Bob Vila, and gravel is about $1–$3 per sq ft.
  • Tear-out. Removing the old surface adds about $1–$2 per sq ft in labor, per Inch Calculator. Fixr puts removal of an old concrete or asphalt driveway at about $2 per sq ft.
  • Material prices. Hot-mix asphalt sells for $100–$200 per ton, and ready-mix concrete for about $110–$165 per cubic yard, according to Inch Calculator.
  • Thickness and base. Asphalt needs 4–8 in. of crushed gravel under it. Thicker concrete, rebar or mesh, and a deeper base all raise the cost per square foot.
  • Finish. Decorative concrete such as stamping or coloring runs $8–$21 per sq ft, compared with $5–$8 for plain, per ConcreteNetwork.

DIY or hire a pro

Gravel is a realistic DIY job with a rented skid steer or a delivery truck that spreads as it dumps. Concrete is possible for a small slab, but a 600 sq ft driveway means several truckloads that must be placed and finished before they set, which takes a crew.

Asphalt is a pro job. It goes down hot and has to be spread and rolled with a paver and roller within a short window. Tearing out an old concrete or asphalt driveway also needs heavy equipment and a place to haul the debris.

Replace or repair

Bob Vila says most asphalt driveways last up to 20 years, and LawnStarter puts a well-built concrete driveway at 20–35 years. Fixr says a well-kept gravel driveway can last far longer, and Inch Calculator notes it needs new top stone every few years.

Cracks, small potholes and a worn surface can often be patched, sealed or resurfaced: ConcreteNetwork puts concrete resurfacing at $3–$10 per sq ft. Replace the driveway when the base has failed, with wide cracks, sunken sections or heaved slabs across large areas, since a new top layer won't fix a bad base.

Signs it needs replacing

  • Cracks keep reopening after patching or run across much of the surface.
  • Sections have sunk, heaved or broken into loose pieces.
  • Water pools on the driveway or runs toward the house after rain.
  • An asphalt driveway is past 20 years and patching no longer holds.

How our range compares with published estimates

Figures as each site published them, for the job and size they state. We show them for comparison; they are not inputs to our model. Ours: $3,700–$10,600 (Asphalt, tear-out and repave, 600 square feet).

SourcePublished figureWhat it covers
Bob Vila$4,200–$9,000Asphalt driveway, installed (total range)
ConcreteNetwork$3,200–$13,000Concrete driveway, nationwide total (2026)
LawnStarter$1,885–$6,475Concrete driveway, typical total (new pour)
Fixr$1,000–$3,000Gravel driveway

Driveway replacement cost by state

Hired price, Asphalt, tear-out and repave, 600 square feet. Labor scales with each state's BLS mean wage for cement masons and concrete finishers (SOC 47-2051); equipment prices are national.

Show all 51 states
StateHired priceLabor rate
Alabama$3,350–$9,450$50–$80/h
Alaska$4,300–$12,400$80–$125/h
Arizona$3,700–$10,600$60–$95/h
Arkansas$3,350–$9,450$50–$80/h
California$4,100–$11,700$75–$115/h
Colorado$3,750–$10,700$65–$100/h
Connecticut$3,750–$10,700$65–$100/h
Delaware$3,750–$10,700$65–$100/h
District of Columbia$3,850–$11,000$65–$105/h
Florida$3,500–$9,900$55–$85/h
Georgia$3,350–$9,600$50–$80/h
Hawaii$4,300–$12,400$80–$125/h
Idaho$3,600–$10,200$60–$90/h
Illinois$4,300–$12,300$80–$125/h
Indiana$3,750–$10,700$65–$100/h
Iowa$3,650–$10,400$60–$95/h
Kansas$3,600–$10,300$60–$95/h
Kentucky$3,500–$9,900$55–$85/h
Louisiana$3,500–$9,950$55–$85/h
Maine$3,650–$10,400$60–$95/h
Maryland$3,550–$10,100$55–$90/h
Massachusetts$4,150–$11,800$75–$120/h
Michigan$3,700–$10,500$60–$95/h
Minnesota$4,050–$11,700$75–$115/h
Mississippi$3,350–$9,450$50–$80/h
Missouri$3,850–$11,000$65–$105/h
Montana$3,800–$10,800$65–$100/h
Nebraska$3,450–$9,900$55–$85/h
Nevada$3,850–$11,000$65–$105/h
New Hampshire$3,700–$10,500$60–$95/h
New Jersey$4,000–$11,500$70–$110/h
New Mexico$3,500–$9,950$55–$85/h
New York$4,150–$11,800$75–$120/h
North Carolina$3,350–$9,450$50–$80/h
North Dakota$3,600–$10,300$60–$95/h
Ohio$3,850–$11,000$65–$105/h
Oklahoma$3,350–$9,450$50–$80/h
Oregon$4,050–$11,600$75–$115/h
Pennsylvania$3,800–$10,800$65–$100/h
Rhode Island$3,900–$11,200$70–$105/h
South Carolina$3,550–$10,100$55–$90/h
South Dakota$3,350–$9,550$50–$80/h
Tennessee$3,350–$9,550$50–$80/h
Texas$3,350–$9,600$50–$80/h
Utah$3,600–$10,200$60–$90/h
Vermont$3,800–$10,900$65–$100/h
Virginia$3,500–$9,950$55–$85/h
Washington$4,300–$12,400$80–$125/h
West Virginia$3,400–$9,700$50–$85/h
Wisconsin$4,000–$11,500$70–$110/h
Wyoming$3,700–$10,600$60–$95/h

Questions

Is asphalt or concrete cheaper for a driveway?

The two are close. ConcreteNetwork lists plain concrete at $5–$8 per sq ft installed before tear-out, and Bob Vila puts asphalt at $7–$15 per sq ft installed. Concrete usually lasts longer: 20–35 years per LawnStarter, against up to 20 years for asphalt per Bob Vila.

How much does it cost to remove an old driveway?

Roughly $1–$2 per sq ft, according to Inch Calculator and Fixr. LawnStarter puts removal of an old concrete driveway at $1,500–$2,500 in total.

Can I pave over my old driveway instead of replacing it?

Sometimes. An overlay works when the base is solid and the surface is only worn or lightly cracked. If the base has failed, cracks come back through the new layer.

What size is a typical driveway?

ConcreteNetwork uses 16 by 40 ft, or 640 sq ft, for a typical two-car driveway, which is why this page defaults to 600 sq ft.

Related replacement costs

Sources

  1. Inch Calculator: Asphalt driveway cost. Installed $7–$13 per sq ft; materials $5–$7 per sq ft; hot mix $100–$200 per ton; labor $2–$6 per sq ft at $40–$55/h; removal adds $1–$2 per sq ft labor; replacement $8–$15 per sq ft; 4–8 in. gravel base. Hours here are implied by the labor $/sq ft and hourly rate. Checked 2026-11-29.
  2. Bob Vila: Asphalt driveway cost. Installed $7–$15 per sq ft, total $4,200–$9,000; replacement $8–$15 per sq ft including removal and disposal; hot mix $100–$200 per ton; labor $5–$7 per sq ft; most asphalt driveways last up to 20 years. Checked 2026-11-29.
  3. Inch Calculator: Concrete driveway cost. Simple concrete $5–$7 per sq ft installed; calculator materials about $2.20–$4.40 per sq ft for concrete plus $0.35–$0.50 job supplies; ready-mix $110–$165 per cubic yard; crew pace 15–20 sq ft per hour; labor about 40% of cost. Checked 2026-11-29.
  4. Inch Calculator: Gravel driveway cost. Gravel driveway $1–$3 per sq ft installed; driveway gravel $15–$75 per cubic yard; labor $40–$55/h. Checked 2026-11-29.
  5. Fixr: Gravel driveway cost. $1,000–$3,000, average $1,750; gravel $50–$100 per cubic yard delivered and spread; labor $60–$100/h, $1,150–$1,250 for an average two-car driveway; removal of old concrete or asphalt about $2 per sq ft. Hours here are that labor cost divided by the hourly rate over roughly 600 sq ft. Checked 2026-11-29.
  6. ConcreteNetwork: Concrete driveway cost. Updated 2026-01-13: plain gray $5–$8 per sq ft, decorative $8–$21; tear-out about $1 per sq ft plus disposal; resurfacing $3–$10; total $3,200–$13,000; typical two-car driveway 16 x 40 ft. Checked 2026-11-29.
  7. LawnStarter: Concrete driveway cost. Updated 2025-12-27: $6–$16 per sq ft; typical $1,885–$6,475; old driveway removal $1,500–$2,500; labor about 50%; lifespan 20–35 years. Checked 2026-11-29.
  8. BLS Occupational Employment and Wage Statistics, May 2025: Cement Masons and Concrete Finishers (SOC 47-2051), mean hourly wage by state. Fetched 2026-11-29.